Untitled project
Installation package review
These checks record coordination, not engineering approval. The crane provider and site contractors must verify field conditions and their scope.
Unknown details remain “To confirm.” Generate a new report whenever information changes.
Installation layout
Add an aerial to beginEvery good plan starts
with the right place.
Add a top-down aerial, then calibrate
the scale using a known distance.
Product order & delivery specifications
Record the ordered product or import its configuration, then plan delivery and installation.
Import an existing product configuration
Delivery weight
Confirm shipping configuration and rigging. Record delivery weight and its source in Site plan.
Coordinate placement, delivery access, crane setup, power and foundation readiness before scheduling.
Evidence, before assumptions.
Source photographs and project facts stay attached to the plan.
Delivery & utility specifications
Product details carry over automatically. Complete the site arrangements below; use “To confirm” while waiting on a customer or contractor.
Confirm what arrives and how it gets in
Reference weight is an estimate until verified. Crane provider confirms rigging, capacity and ground support.
Access & crane review checklist
Check each item only after it has been reviewed with the responsible contractor.
Coordinate the supply and connection
Review or amend electrical requirements
Confirm the base is ready for this product
Footprint is not a foundation design. Thickness, bearing, anchorage and elevations must come from the applicable approved specification.
Internal notes & project backup
Internal notes are excluded from the client report.